804 Lotus Drive
San Marcos, CA 92069
$ 769,000
Price
3
Beds
3.5
Baths
1,781 Sq. Ft.
$432 / Sq. Ft.
61 Days On Market
Listed By Shawn Black (DRE# 01490462) at Meritage Homes Of California.
Have You Been Pre-Qualified? Start Now
Brand new, energy-efficient home! Finesse package. Solar system included (no lease). Photos are of builder model home. The first-floor bed with full bath provides comfort for visiting guests or a home office. The open-concept living space is ideal for entertaining, featuring a chef-inspired kitchen with large island, dedicated dining space, and a powder bath for guests. Cielo, in San Marcos, CA, is the place for your carefree SoCal life. Offering stylish townhomes with spacious, open-concept floorplans, chef-inspired kitchens, primary suites with walk-in closets and covered decks. Homeowners will benefit from Cielo's turnkey, move-in ready features such as included Whirlpool® appliances and whole home blinds. Each of our homes is built with innovative, energy-efficient features designed to help you enjoy more savings, better health, real comfort and peace of mind.
Last Updated: 48 days ago
Want all these details? Sign In or Join Now